Pool project completed in 2018 in Charlotte, NC for Whiting Turner. (Photos courtesy of https://novelstonewallstation.com/gallery).
Student housing project completed in 2017 for Faver Gray in Lubbock, TX. Some photos courtesy of 2100 at Overton Park social media.
Project was completed in 2018 in Uptown Charlotte, NC for Summit Contracting. (Photos courtesy of https://novelnoda.com/gallery/)
We were brought in on the front end of the project by Northwood Ravin to consult this project's beautiful amenity area. We designed this courtyard vault pool, developed the engineered drawings, handled all of the permitting, created the scope of work, vetted the top local pool builders. We were able to turn over the top 3 bids from the best companies for the job to Northwood Ravin for their selection. (Photos courtesy of https://galleriesatparklane.com/gallery/)
Student housing project for Baylor University in Waco, TX built for Faver Gray in 2015. (Photos from various sources including 18Nineteen's social media).
Project was completed in 2016 in Nashville, TN with Balfour Beatty. (Photos courtesy of https://www.infinitymusicrow.com/gallery/).
Project was completed in 2018 for Fortune Johnson.
Project was completed in 2016 in Charlotte with Fortune Johnson. (Photos courtesy of https://soliswaverly.com).
Amenity area project for LMC in Nashville, TN completed in 2016. (photos courtesy of https://www.octavenashville.com/photos/).
Project completed in Greenville, SC in 2017 for Flournoy Construction. (Some photos courtesy of http://districtwestapts.com/gallery
Project was completed in 2016 for Fortune Johnson. (Some photos courtesy of https://www.cr-theflatsatballantyneapts.com).
We created the design and handled the engineered drawings for this project in Atlanta. This project was completed in 2013.
Pool project completed in 2015 in Wake Forest, NC for CF Evans. (Photos courtesy of http://capitalcreekheritage.com/gallery/).
Project completed in 2015. (Photos courtesy of http://www.squareoneapts.com/photogallery.aspx).
Project completed in 2014. (Photos courtesy of http://m1apartments.com/gallery/).
Project completed in 2015. (Some photos courtesy of http://www.overlookexchange.com/gallery.php).
We handled the amenity area design modification, engineered drawings and permitting for the pool and deck for this project outside of Charleston, SC. Pool and deck construction was completed in 2017.
Student housing project completed with CW Construction for Campus Works in Chattanooga, TN in 2015. (Some photos courtesy of Douglas Heights social media).
Student housing project completed in 2017 in Chapel Hill, NC for Northwood Ravin.